Work package 8: Tests and validation in two remote test beds

Deliverables (brief description) and month of delivery

D8.1 Preparation and Planning of tests (Month 5) Delivery contain preparations and planning of the test beds including implementation from WP2 -WP7.

D8.2 Communication with local community (Month 8)

Report from two (2) Local Work Shops  

- Local work shop Sweden

- Local work shop Slovenia

D8.3 Test Bed Creation – Methodological Report (Month 17)

D8.4. Test Results - Documentation of test results from tests. (Month 34)